October 30th

The second story of the house is coming along fast and the roofing is going to begin shortly. The stairway is almost done connecting the two levels.

I was able to get pictures when the students from the interior design class were on a field trip to the house to view the progress.

Leave a Reply

Your email address will not be published. Required fields are marked *